Silverstream Bridge – Overnight closure for resurfacing: Wednesday 9th of July, 9.00 pm – 4.00 am

Silverstream Bridge – Overnight closure for resurfacing: Wednesday 9th of July, 9.00 pm – 4.00 am

AI Generated

Plan ahead for an overnight CLOSURE of the Silverstream Bridge (Fergusson Dr) on Wednesday 9 July from 9pm to 4am for surfacing repairs.

Traffic planning to turn onto the bridge from the state highway will need to follow the signposted detours.

Read our full media release and detour options here: https://www.journeys.nzta.govt.nz/traffic-bulletins/silverstream-bridge-closure-state-highway-2-upper-hutt

In the event of bad weather, works will begin on Thursday 10 July.

NZ Transport Agency Waka Kotahi – Wellington

Source: NZ Transport Agency Waka Kotahi – Wellington

03/07/25