Menzshed Upper Hutt Update – May / June 2024

Menzshed Upper Hutt Update – May / June 2024

The ramps/steps for Building #1 are now well underway and the second door steps are now in place.
Several members “dug in” to get the piles in place and erection of the deck is next in line.

Several small projects have been completed during the month. The small set of drawers is now at
the finishing stage before being made available for sale. The quote for the Flygility box (for dogs) was
accepted and work has commenced on making the first two for approval. We have confirmed orders
for another two and an unconfirmed order for a further 4.

Repairs for Kindy

A small table and chair and a wooden train needed to be “firmed up” after constant use by toddlers!

Delicate Shrimp display

This item, made from an antler base and delicate shrimps was the worse for wear before it got
repaired.

Repair of Chair and piano stool

The chair was a bit rocky and needed a re-glue of the joints, whilst the piano stool needed re-
upholstering. Thanks to John and Lindsay for jobs well done!

Finally we provided 20 Stoat traps to Forest and Bird to keep those pesky stoats in check!

Menzshed Upper Hut

Menzshed Upper Hutt submitted this article to The Upper Hutt Connection.

17/06/24

One thought on “Menzshed Upper Hutt Update – May / June 2024

Leave a comment